Site: Port Waratah Coal Service , Newcastle
Task: 531 Belt Installation 800m
Project: Replacement and installation of 2500mm steel cord belt. Completed over two stages with belt preparation and then installation, total project was completed over a month period with the belt preparation taking two weeks and the final installation 3 days. This involved a complex task of joining the belt mechanically and running the belt into a final splicing position.